Inside Perth Arena.

It hasn’t been an easy road in the building of Australia’s Perth Arena.

First, the construction was marred by controversy due to cost and time miscalculations, which increased the price from $150 million to $550 million (Australian).

Then there was a modification to the original design, which relocated the 680-car parking lot from above a nearby railway line to a separate area underneath the venue.

This was in addition to the overall challenges of t...

__________________________________________________________________________

This content requires a VenuesNow subscription.

If you have a subscription please login below: